top of page

Demolition

Bring Your Demolition Dreams to Life with Stripout London Demolition

Are you looking for a reliable and experienced demolition contractor in London? Look no further than Stripout London Demolition. We are a leading demolition contractor, offering comprehensive demolition services for residential and commercial properties throughout London.
Our team of highly skilled and experienced professionals are equipped with the latest technology and equipment to handle even the most complex demolition projects. 

 

We pride ourselves on delivering exceptional service, quality workmanship, and a commitment to safety and the environment.
At Stripout London Demolition, we understand that every project is unique, and we work closely with our clients to ensure their specific needs and requirements are met. Whether you are looking to demolish a single room, an entire building, or anything in between, we have the expertise and knowledge to get the job done right.


We are fully licensed and insured, and we are committed to meeting all relevant regulations and safety standards. Our team takes great care to minimize any disruption to your property or the surrounding area, and we work efficiently to complete your demolition project on time and on budget.


Don't settle for anything less than the best. Choose Stripout London Demolition for your next demolition project and experience the difference. Contact us today to schedule a consultation and see how we can help bring your demolition dreams to life."
 

What is Demolition?

​

Demolition (also known as razing, cartage, and wrecking) is the science and engineering in safely and efficiently tearing down of buildings and other artificial structures. Demolition contrasts with deconstruction, which involves taking a building apart while carefully preserving valuable elements for reuse purposes.
 
For small buildings, such as houses, that are only two or three stories high, demolition is a rather simple process. The building is pulled down either manually or mechanically using large hydraulic equipment: elevated work platforms, cranes, excavators or bulldozers.
 
Larger buildings require the use of rotational hydraulic shears and silenced rock-breakers attached to excavators to cut or break through wood, steel, and concrete. 

Before any demolition activities can take place, there are many steps that must be carried out beforehand, including performing asbestos abatement, removing hazardous or regulated materials, obtaining necessary permits, submitting necessary notifications, disconnecting utilities, rodent baiting and the development of site-specific safety and work plans.

The typical demolition of a building is accomplished as follows:

​

  • Hydraulic excavators may be used to topple one- or two-story buildings by an undermining process. The strategy is to undermine the building while controlling the manner and direction in which it falls.

  • The demolition project manager/supervisor will determine where undermining is necessary so that a building is pulled in the desired manner and direction.

  • The walls are typically undermined at a building's base, but this is not always the case if the building design dictates otherwise. Safety and cleanup considerations are also taken into account in determining how the building is undermined and ultimately demolished.

​

High reach demolition excavators are more often used for tall buildings where explosive demolition is not appropriate or possible. Excavators with shear attachments are typically used to dismantle steel structural elements. Hydraulic hammers are often used for concrete structures and concrete processing attachments are used to crush concrete to a manageable size, and to remove reinforcing steel. For tall concrete buildings, where neither explosive nor high reach demolition with an excavator is safe or practical, the "inside-out" method is used, whereby remotely operated mini-excavators demolish the building from the inside, whilst maintaining the outer walls of the building as a scaffolding, as each floor is demolished.

​

To control dust, fire hoses are used to maintain a wet demolition. Hoses may be held by workers, secured in fixed location, or attached to lifts to gain elevation.

Loaders or bulldozers may also be used to demolish a building. They are typically equipped with "rakes" (thick pieces of steel that could be an I-beam or tube) that are used to ram building walls. Skid loaders and loaders will also be used to take materials out and sort steel.

bottom of page